East Hardy Street/Main Street Petal Bridge Replacement, Project No. ERBR-18(03) – Forrest County, Mississippi

Project Owner: Forrest County

Bid Date:  10:00 AM, 10 December 2020

Bid Location: Office of the Clerk of Forrest County, Forrest County Chancery Courthouse, 641 N. Main Street, Hattiesburg, Mississippi, 39403

Description:  This project generally includes the construction of approximately 3,800 linear feet of East Hardy Street (Hattiesburg) and Main Street (Petal) as a 2-lane boulevard with a center median or continuous center turn lane, curb and gutter, a 12 foot wide, 4 inch thick, concrete multi-use path along the north side of the road; and the construction of a new bridge with a length of approximately 980 feet, a width of 42 feet, a continuous steel girder main span with a length of 500 feet and a maximum span of 300 feet, concrete girder approach spans with a maximum span of 100 feet, concrete columns, steel piles, and concrete pile caps.  All other related items of work required to complete the project as shown and specified in the Contract Documents. All in Forrest County, Mississippi.

Official Bid Documents: Can be downloaded from www.centralauctionhouse.com. For any questions relating to ordering bid documents, please call Central Bidding at 225.810.4814.

Project Link: East Hardy/Main St Bridge Replacement

Engineer’s Estimate: n/a