01.jpg
640x480x16M
[50 KB] |
The beginning of the construction of the tank with the excavation of the
footings. |

02.jpg
640x480x16M
[50 KB] |
The construction of the footings continues with the formwork. |

03.jpg
640x480x16M
[51 KB] |
The footings are poured and the pedestals are formed. |

04.jpg
640x480x16M
[51 KB] |
Some of the risers have been poured while others are still in the process
of having the steel and formwork added. |

05.jpg
640x480x16M
[52 KB] |
All of the risers have been poured and the backfilling of the foundations
is about to commence. |

06.jpg
640x480x16M
[53 KB] |
A view of the foundations from ground level. |

07.jpg
640x480x16M
[50 KB] |
Another view of the foundations during construction from inside the
excavation. |

Image01.jpg
640x480x16M
[48 KB] |
Setting up the construction crane. |

Image02.jpg
640x480x16M
[49 KB] |
A lot of equipment is needed for the construction of a water tank. |

Image06.jpg
480x640x16M
[19 KB] |
The erection of the first leg of the tank. |

Image08.jpg
640x480x16M
[53 KB] |
More sections of the crane with a view to the North of the site (Temple
Baptist Church in the background). |

Image12.jpg
640x480x16M
[44 KB] |
A view of the bottom of the tank riser during construction. |

Image13.jpg
640x480x16M
[50 KB] |
Another view of the bottom of the tank riser during construction. |

Image14.jpg
640x480x16M
[49 KB] |
Welders setting up. |

Image15.jpg
640x480x16M
[24 KB] |
Work on the riser pipe continues. |

Image18.jpg
640x480x16M
[25 KB] |
And continues some more. |

Image21.jpg
640x480x16M
[48 KB] |
Sections of the tank legs are hoisted by the crane. |

Image22.jpg
640x480x16M
[49 KB] |
The sections are then welded in place by the contractors personnel. |

Image25.jpg
640x480x16M
[45 KB] |
The legs are finally all in place. |

Image26.jpg
640x480x16M
[50 KB] |
The first sections of the elevated tank itself are raised by the
crane. |

Image27.jpg
640x480x16M
[46 KB] |
The sections are hoisted carefully and placed at their final
location. |

Image28.jpg
640x480x16M
[45 KB] |
. . . placement of the tank sections. |

Image29.jpg
640x480x16M
[36 KB] |
The first section is finally in place. |

Image30.jpg
640x480x16M
[46 KB] |
The second section is on its way. |

Image31.jpg
640x480x16M
[54 KB] |
The second section is placed. |

Image34.jpg
640x480x16M
[46 KB] |
And they're finally placing the last sections of the tank. It looks
complete except for the painting. |

Image35.jpg
640x480x16M
[51 KB] |
The tank is complete and the view to the East is pretty good. |

Image36.jpg
640x480x16M
[44 KB] |
The view north along Oak Grove Road is pretty good too! |

Image41.jpg
640x480x16M
[51 KB] |
But the view down is pretty scary (glad I didn't have to climb that
thing). |

Image43.jpg
640x480x16M
[37 KB] |
Here's a good view of the new Oak Grove School from the top of the tank.
Don't you kids get any ideas! |

Image46.jpg
640x480x16M
[38 KB] |
The tank from the ground underneath. |
|
|