Froelich Dam Breach Predictor Equations
b = 9.5 K0(VsH)0.25
T = 0.59 (Vs0.47)H-0.91
- b = Average Breach Width (ft),
- K0 = 0.7 for Piping & 1.0 for Overtopping Failure
- Vs = Storage Volume (ac-ft)
- H = Selected Failure Depth (ft) above Breach Bottom
- T = Time of Failure (hrs, ~H/120 or Minimum of 10 Min)